Sainsbury UK – Logistics Projects
Various UK Locations
Previous slide
Next slide
Project Details
Client: Sainsbury UK
Architect: Ashton Smith Architects
Value: €30.0M
Services Provided: C&S Engineering Services
Category: Logistics
Project Duration: 2009 – 2011
Project Description
Sainsbury’s Logistic Centre – Thurrock UK.
- Condition survey of existing buildings and surrounding yard areas to establish defects
- Alterations to the existing mezzanine to accommodate the significant refrigeration
plant loadings, - Construction of a new steelwork gantry
- Establishment of slab repair requirements to facilitate end use.
- Fit out and structural alterations to the existing building and the floor slab including the installation of new drainage and alterations to the existing drainage for two outlying buildings
- Construction of new two storey office block adjacent existing distribution building
- Civil and structural input into new Vehicle Wash, Fuel Island, loading docks and scissor lift installation, and yard alterations.
Sainsbury’s Logistic Centre – Greenford UK
- Condition survey of existing building and surrounding yard areas to establish defects
- Alterations to the existing mezzanine to accommodate the significant refrigeration plant loadings
- Establishment of slab repair requirements to facilitate end use.
- Civil and structural input into new vehicle wash and fuel Island, new loading docks and yard alterations including car parking.
- Evaluation of alternative access arrangements to the site to accommodate new site entrance.
AG Thames – Chingford
Extension of the existing logistics facility onto adjacent site allowing for 13,000m2 of warehousing as well as tractor and trailer parking.
Works included:
- Site appraisal in advance of site purchase.
- Preparation of water supply, surface and foul drainage proposals and associated liaison with Thames Water.
- Site levels strategy to optimise existing site topography
- Development of site layout and checking with Autotrack software.