H&MV Engineering Wind Farm Substations ​

PUNCH have provided civil and structural service to H&MV Engineering since 2015. A list of the wind farm substation where we provided civil and engineering design for the steelwork to support the electoral equipment are as follows:

  1. Galway windfarm substation steelwork
  2. Mayo Power Killala substation steelwork
  3. substation Derrysallagh Knockroe Co. Sligo
  4. Tullabrack windfarm Co Clare
  5. Slievecallan windfarm Ennis 110 kv cable
  6. Cordal cable chair
  7. Garvagh cable chair
  8. Clonshaugh Co. Dublin
  9. Brinny co cork
  10. Carrickallen, Aghaway
  11. Ferrybridge substation
  12. Greygrove substation
  13. Cloonfaughna/Maghermore 38kv substation
  14. Faberg 300kv substation Norway & Brinny piperack cable pull assessment
  15. slievekirk wind farm
  16. Callowhill water supply transformer & pump station
  17. Mauricetown 38kv substation
  18. Tullylease 38kv substation
  19. Bollmora substation Sweden

The steelwork designs take into account wind, seismic, cable catenary forces, thermal forces, cable forces from surge loading and deflection requirements.

PUNCH provide this service to H&MV both nationally and internationally (Sweden and Holland).

Client:H&MV EngineeringValue:VariesServices Provided:C&S Engineering ServicesCategory:Energy & EnvironmentalProject Duration:2015 – presentShare
At PUNCH, we understand the value of education. That’s why we support our staff who wish to undertake further education and training. We encourage staff members to maintain their Continuous Professional Development (CPD) accreditations with Engineers Ireland. We also continue to offer training in sustainable design and construction through seminars, in-house lectures, and external training programmes. We promote the achievement of professional titles with institutions such as Engineers Ireland, the Association of Consulting Engineers of Ireland, the Institute of Structural Engineers, and the Institute of Civil Engineers. Read More.