PUNCH Consulting Engineers were commissioned by Dún Laoghaire-Rathdown County Council to carry out a hydrological investigation of a stream running through the eastern side of Marlay Park in Dublin City. The purpose of this study was to estimate drought, flood and seasonal average discharge rates of the stream in Marlay Park. This data was used to assess the feasibility of constructing an Artificial White Water Course.
As part of the Water Framework Directive (WFD), the EPA has established a website that will provide users with flow duration curves for both gauged and ungauged catchments. This data provided a basis for estimating the potential water yields of the water course and in particular, the seasonal variability of the potential abstraction rates from the water course for use in the proposed artificial white water course.
This study is predominately a desktop study and its findings will be of benefit to the design team of a new artificial white water course. It was also concluded that 12 months of flow monitoring should take place.


At PUNCH, we understand the value of education. That’s why we support our staff who wish to undertake further education and training. We encourage staff members to maintain their Continuous Professional Development (CPD) accreditations with Engineers Ireland. We also continue to offer training in sustainable design and construction through seminars, in-house lectures, and external training programmes. We promote the achievement of professional titles with institutions such as Engineers Ireland, the Association of Consulting Engineers of Ireland, the Institute of Structural Engineers, and the Institute of Civil Engineers.
Read More. 

